You charge an electric van by connecting it to a compatible AC or DC chargepoint, whether at a depot, a workplace, a driver’s home or a public charging location. The right approach depends on the van’s charging capability and on how long it can stay parked before its next job. Below, you’ll find how to charge an electric van step by step, from charger types and connectors to costs and route planning.
Not every chargepoint works with every electric van.
AC charging feeds power through the van’s onboard charger, so it usually suits longer parking periods. DC rapid charging supplies power straight to the battery and can add energy much faster, as long as the van supports it.
“Fast” and “rapid” don’t mean one fixed speed. A van can charge no faster than the lower of the charger’s output and its own maximum rate, and the actual speed often drops during the session.
Charging type | Typical use | What to check |
AC depot or workplace charging | Overnight or scheduled charging | Charger output, the van’s maximum AC rate and available downtime |
AC home charging | Vans taken home by drivers | Installation, parking, charging policy and reimbursement |
DC rapid charging | Faster charging during the working day | The van’s maximum DC rate, charger output, cost and location |
Public charging | Longer or less predictable journeys | Connector, availability, charging speed and price |
Type 2 is the most common connector for AC charging on current electric vans in the UK, used on depot and most home chargepoints.
CCS is the most common connector for DC rapid charging on current electric vans.
Most current electric vans use Type 2 for AC and CCS for DC, but older vehicles can differ, so check the exact van’s specification.
There’s no single charging time. It depends on how much energy needs adding and how fast the van and charger can deliver it. Starting and target charge levels matter, as do battery temperature and the van’s charging curve, which usually slows as the battery fills.
Battery capacity is measured in kilowatt-hours (kWh), which is energy. Charging power is measured in kilowatts (kW). As a rough guide:
Energy added (kWh) ÷ charging power (kW) = approximate charging time
Treat this as an estimate only, because a van doesn’t stay at its maximum rate for the whole session. For example, the Ford E-Transit Courier in the Dawsongroup vans fleet accepts DC charging at up to 100kW and lists around 20 minutes for a 10% to 80% rapid charge, and around six hours on a 7.4kW AC charger. A 10% to 80% time isn’t a full charge.
Public charging is useful for longer routes and daytime top-ups, and for fleets that can’t rely entirely on depot charging. It isn’t the right main charging method for every fleet.
UK rules require public chargepoints to show the price in pence per kWh, and specified public chargepoints must accept contactless payment.
1. Find a charger on your route with the right connector, and check its power against what the van can accept.
2. Check the price before you start.
3. Connect the van and authorise the payment or session.
4. Add enough energy for the rest of the route, then end the session and disconnect.
Vans that return to the same depot or workplace can often charge while they’d be parked anyway, such as overnight or between shifts. To make it work, match when vans return and how long they stay parked to how much energy each one needs. The number of vans charging at once, charger output and the site’s electrical capacity all play a part.
For site surveys and electrical upgrades, see the EV charging infrastructure guide.
The basic calculation is:
Energy added (kWh) × electricity price per kWh = charging cost
If a van needs 40kWh added, the cost is 40 multiplied by the pence-per-kWh rate you’re paying. There’s no fixed national cost: it depends on your site tariff or the public network you use, as well as vehicle efficiency and charging habits. Public rapid charging is often priced differently from electricity at a business site. Charger installation costs are separate. The electric van calculator compares electric and diesel van running costs.
Plan charging so each van has enough energy for its next period of work, with a sensible margin, rather than charging to 100% at every opportunity or relying on the full published WLTP range. Our electric van battery size guide and electric van business leasing checklist cover route and fleet planning in more detail.
If you’re planning your transition to electric vehicles, a useful planning tool is our electric van calculator, which can aid you in discovering the best van lease for a small business. You can compare electric van suitability, charging needs, daily mileage and potential running considerations before choosing vehicles that are right for your business.
Dawsongroup vans can help you compare electric vans around your routes and loads, with range and charging capability matched to the work. See electric van hire and leasing for the wider range, or contact us to talk through your fleet.
How to Contact Us:
Tel: 0844 381 9000
Email: contactus@dawsongroup.co.uk
Whether businesses need planning permission to install electric van chargers depends on the site, electric van charger location, building status and local requirements. Businesses should check with their installer and local planning authority before installation, especially for visible external equipment, listed buildings, shared sites or larger depot projects.
Who pays for home charging if employees take electric vans home should be agreed in a clear workplace policy. Some businesses reimburse employees for business mileage or charging costs, while others may provide a home charger or use charge tracking software.
Businesses should install chargers before ordering electric vans. It is usually sensible to plan charging before vehicles arrive, even if installation happens in phases. Lead times for site surveys, landlord approvals, electrical upgrades and charger installation can affect deployment. Aligning vehicle orders with electric van charger readiness helps reduce operational disruption and avoids vans being delivered before the business has a reliable way to charge them.
Yes, charging infrastructure can be scaled as the electric van fleet grows, but it is easier when scalability is considered from the start. Businesses should think about spare electrical capacity, future parking spaces, charger management software and whether the site can support more vehicles later. A phased approach can help control cost while keeping the charging setup ready for fleet expansion.